Description
Challenger A2115-2 Equalizer Cable for CL10 2-Post Lift – 2-Foot Extended Height (13’8″ Columns)
This is one equalizer (synchronizer) cable for the Challenger CL10 2-post car lift with 2-foot extended-height columns measuring approximately 13’8″ from base to top of column. When equalizer cables wear, fray, or stretch unevenly, the lift carriage can become out of sync – replacing them restores proper operation. This cable features galvanized steel construction with threaded stud ends for secure attachment.
This listing is for 1 cable. Equalizer cables stretch under normal use and should be replaced in sets.
Important: This cable only fits the 2-foot extended-height version of the CL10. If your lift has standard 11’8″ columns, order Challenger A2115-0 instead.
Product Information
- Brand / Equipment: Challenger Lifts, CL10 2-post series (2-foot extended height)
- Manufacturer / Reference Part Number: Challenger A2115-2
- Store SKU: CHR2115-2
- Component: Equalizer / synchronizer cable
- Quantity: 1 cable
- Material: Galvanized steel
- Column Height Fitment: 2-foot extended height – columns measuring approximately 13’2″ to 13’8″
- Listed Application: Challenger CL10 2′ Extended, CL10V3 2′ Extended, CL10-QC 2′ Extended; Ammco AC21NS 2′ extended version
Compatible Makes / Verified Fitment Models
The following models are confirmed for part number A2115-2 from INSACOA and autoliftsandparts.com:
- Challenger: CL10-2 (2-foot extended height), CL10V3 2′ extended, CL10-QC 2′ extended
- Ammco: AC21NS (2-foot extended version only)
- ADG: TC2P10-2
- Magnum: OE-10-2
Fitment & Ordering Notes
Verify your lift model and serial number before ordering. The serial number is on the ID tag on the column of the lift, not on the motor. Confirm that your lift has 2-foot extended-height columns (approximately 13’2″ to 13’8″ from base to top of column) before ordering. For standard-height CL10 lifts with 11’8″ columns, order A2115-0 instead. We recommend replacing both equalizer cables at the same time to maintain even synchronization and safe lift operation. Inspect sheaves and pulleys when replacing cables.





